There’s a lot of weird parts as well as pieces in a full system Heating as well as A/C replacement.
Each one of these parts as well as pieces takes a particular amount of time as well as detail to install.
When I have to make a full system replacement, I always tell the customer that it is going to take all day. It takes at least an hour or two to detach all of the old pieces of heating as well as A/C equipment. If I have to complete the ductwork as well, then my pal and I can add even more time to the replacement. Customers often do not suppose me when I tell them that it’s going to take all day, although I tell them that there’s a lot of labor involved, just last yearI had a full system Heating as well as A/C replacement. The customer had a faulty heat pump as well as decided to replace the heat pump as well as the A/C condenser. I knew it was going to take at least 8 hours to get the job done as well as that was with a second worker toiling alongside me all day. I told the customer that my pal and I would need access to the household as well as someone had to be there while my pal and I were toiling. If I have any questions or problems, I need to be able to speak with the owner of the house. The guy moaned as well as groaned when my pal and I hit hour five as well as my pal and I were only halfway done. It’s not convenient for the customer to stay all day, however it is a liability issue. I had some issues in the past as well as it is much easier just to have the customer condo during the replacement.